Seamline Pacific BuildersInnovate. Build. Excel.

Projects

Seamline Pacific Builders’ own work: multifamily, luxury residential, civic and correctional, and industrial projects across California, Colorado, Washington, Oklahoma, Arizona and New Hampshire.

Plus 30 years of experience: see the 25 projects our President led before founding Seamline.

Century Regional Detention Facility

Civic / Correctional

Century Regional Detention Facility

  • 11705 S. Alameda Street, Lynwood, CA 90262
  • 426 days (14 months)

A comprehensive replacement of the fire-alarm system and elevators at an LA County jail housing ~2,150 inmates — executed inside a fully operational, high-security correctional environment. Delivered to a 14-month schedule while meeting Project Labor Agreement and prevailing-wage requirements, without taking the facility offline.

Highlights. 426-day delivery; full fire-alarm + elevator replacement; ~2,150-bed active LA County facility; PLA & prevailing-wage compliant.

Lynden Light Industrial

Industrial / Food Processing

Lynden Light Industrial

  • Lynden, Washington
  • Current project

A light-industrial food-processing facility in Lynden, Washington. Building shell and sitework.

Twin Towers Elevator Replacement

Civic / Correctional

Twin Towers Elevator Replacement

  • 450 Bauchet Street, Los Angeles, CA 90012

A full modernization of 24 elevators across Tower 1, Tower 2, the Correctional Treatment Center, and the Inmate Reception Center — with the HVAC and fire-alarm systems tied to them — sequenced to keep a secure, 24/7 facility fully operational throughout. Upgraded cab interior finishes deliver a cleaner, safer ride.

Highlights. 24-elevator modernization across four facility zones; integrated HVAC & fire-alarm upgrades; executed live in a secure, occupied facility.

SWORD Logistics Center
Rendering

Industrial / Logistics

SWORD Logistics Center

  • Tulsa, OK

A two-building tilt-up industrial park (±212,040 SF on ±10.35 acres) in Tulsa. Seamline is delivering a full exterior repaint program and a design-build exterior signage program — from survey and specification through phasing that keeps tenant dock and drive operations running.

Highlights. Two tilt-up buildings; ±212,040 SF; ±10.35 acres; exterior repaint + signage design-build.

Meredith Lake House
Rendering

Luxury Residential

Meredith Lake House

  • 49 Eaton Ave, Meredith, NH
  • Completed 2026

A 5,000-square-foot legacy lakehouse in New Hampshire’s Lakes Region — a multigenerational gathering place designed for connection and comfort. Warm oak cabinetry, layered tile, and brass accents beneath vaulted ceilings and exposed beams, with expansive glazing framing the lakefront.

Highlights. 5,000 SF; 5 bed / 4.5 bath; lakefront glazing, vaulted ceilings & exposed beams.

Ridgeline Apartments
Rendering

Multifamily

Ridgeline Apartments

  • 1930 W College Ave, San Bernardino, CA 92407

33 New Additional Dwelling Units Folded into Existing Apartment Complex

Broadview Apartments

Multifamily

Broadview Apartments

  • 1925 W College Ave, San Bernardino, CA 92407

55 New Additional Dwelling Units Folded into Existing Apartment Complex

Highlights. Construction of ADU Additional Dwelling Units

Charlmont Village Apartment ADU's

Multifamily

Charlmont Village Apartment ADU's

  • 1625 E G St, Ontario, CA 91764

22 New Additional Dwelling Units Folded into Existing Apartment Complex

Highlights. Construction of ADU Additional Dwelling Units

500 West Francis Street

Luxury Residential

500 West Francis Street

  • West End, Aspen, Colorado

An 1884 residence and carriage house on a 6,000 sq ft West End lot, designated a City of Aspen historic landmark in 1982. The work lifts both historic structures in place to add a full basement on a new foundation, removes non-historic additions, and restores the original wood and scalloped siding, doors, windows and porch to match historic photos, alongside a new addition.

Highlights. Historic renovation and expansion.

406 West Smuggler Street

Luxury Residential / Historic

406 West Smuggler Street

  • Aspen, Colorado

A City of Aspen historic landmark since 1989. The project pairs preservation of the property’s small historic building with new development, and in 2026 Aspen City Council approved a transferable development right from the site to help fund that preservation.

Highlights. Historic renovation and expansion.

Lower Buckeye

Industrial / Logistics

Lower Buckeye

  • 4215 W Lower Buckeye Rd, Phoenix, Arizona

Construction remodel of a logistics center in Phoenix.

Principal’s prior experience

Healthcare, higher education, central plants, aviation, sports, high-rise and multifamily across Southern California.

Before founding Seamline, Ryan Dumoulin led these projects in senior roles at prior firms. Shown as his individual experience, not Seamline Pacific Builders, Inc. company past performance.

  • Sunset + Vine Tower

    Sunset + Vine Tower

    High-Rise / Mixed-Use, Hollywood, CARyan’s role: Project Executive
  • USC Galen Center

    USC Galen Center

    Sports / Arena, Los Angeles, CARyan’s role: Project Executive255,000 SF multipurpose arena; 10,258 seats; opened 2006.
  • 5600 Wilshire

    5600 Wilshire

    Multifamily, Los Angeles, CARyan’s role: Project Manager~280-unit apartment building; five stories; Miracle Mile (2008).
  • NRDC — Robert Redford Building

    NRDC — Robert Redford Building

    Commercial, Santa Monica, CARyan’s role: Project Manager~15,000 SF; 3-story; among the first LEED Platinum buildings in the U.S. (2003).
  • Doheny Eye Institute

    Doheny Eye Institute

    Healthcare / Medical, Pasadena, CARyan’s role: Project Executive - Mechanical Contractor123,200 SF headquarters & research campus; 32,000+ SF of labs; opened 2022.
  • Kaiser Permanente South Bay Medical Center

    Kaiser Permanente South Bay Medical Center

    Healthcare / Medical, Santa Ana, CARyan’s role: Project Management~280,000 SF; four-story acute-care hospital; 92 med/surg rooms plus ICU & cardiac care.
  • EVOQ Properties Offices

    EVOQ Properties Offices

    Commercial, Los Angeles, CARyan’s role: Project ExecutiveCreative-office build-out for one of downtown LA’s largest industrial/creative-office landlords.
  • Santa Monica College — AET Campus

    Santa Monica College — AET Campus

    Higher Education, Santa Monica, CARyan’s role: Project Executive - Mechanical Contractor3.5-acre media campus; new 30,000 SF instructional wing; renovated 50,000 SF facility; KCRW building + parking structure.
  • LAX — Security Systems Integration

    LAX — Security Systems Integration

    Aviation, Los Angeles, CARyan’s role: Project ManagementAirport-wide security integration; ~$29.7M CCTV expansion + ~$14.2M access-control upgrade; thousands of cameras on a unified platform.
  • CSU Long Beach — Central Plant

    CSU Long Beach — Central Plant

    Higher Education, Long Beach, CARyan’s role: Project Executive - Mechanical ContractorCentral utility plant for a 4.3M SF, 87-building campus; thermal energy storage.
  • CSU Dominguez Hills — Science & Innovation Building

    CSU Dominguez Hills — Science & Innovation Building

    Higher Education, Carson, CARyan’s role: Project Executive$71.5M; ~87,000 SF STEM building; 60+ fume hoods; LEED Platinum target; completed 2020.
  • CSU Dominguez Hills — Innovation & Instruction Building

    CSU Dominguez Hills — Innovation & Instruction Building

    Higher Education, Carson, CARyan’s role: Project Executive - Mechanical Contractor$66.5M; ~107,000 SF; four-story; 250-seat auditorium; completed 2022.
  • CSU San Bernardino — Central Plant

    CSU San Bernardino — Central Plant

    Higher Education, San Bernardino, CARyan’s role: Project Executive - Mechanical Contractor~4,300 tons cooling; 13-boiler condensing hot-water system; ~2M ton-hours TES; 1.5M SF campus.
  • Pierce College — Advanced Automotive Technology Building

    Pierce College — Advanced Automotive Technology Building

    Higher Education, Woodland Hills, CARyan’s role: Project Executive - Mechanical Contractor21,233 SF; $22.3M; three automotive labs (90-vehicle capacity); 10 EV chargers; opened 2023.
  • Pierce College — Central Plant

    Pierce College — Central Plant

    Higher Education, Woodland Hills, CARyan’s role: Project Executive - Mechanical ContractorRenewable central energy plant; solar-thermal absorption cooling; LEED Gold.
  • Cabrillo High School (LBUSD)

    Cabrillo High School (LBUSD)

    K-12 Education, Long Beach, CARyan’s role: Project Management~1,721-student LBUSD comprehensive high school; bond-funded modernization: new aquatics center + 400m track/field.
  • LAUSD — Multiple Projects (13 total)

    LAUSD — Multiple Projects (13 total)

    K-12 Education, Los Angeles, CARyan’s role: Project ManagerA 13-project program of modernizations and new construction across multiple LAUSD campuses.
  • Loma Linda University Medical Center Tower

    Loma Linda University Medical Center Tower

    Healthcare / Medical, Loma Linda, CARyan’s role: Project Executive16-story hospital tower; opened 2021Photo: Lroehlig, CC BY-SA 4.0, via Wikimedia Commons (edited)
  • Riverside Hospital

    Riverside Hospital

    Healthcare / Medical, Riverside, CARyan’s role: Project ExecutivePhoto: Area photo, downtown Riverside: Z3lvs, CC0, via Wikimedia Commons (edited)
  • Kaiser Permanente Woodland Hills — Seismic Retrofit

    Kaiser Permanente Woodland Hills — Seismic Retrofit

    Healthcare / Medical, Woodland Hills, CARyan’s role: Project ExecutivePhoto: Area photo, Woodland Hills: Downtowngal, CC BY-SA 3.0, via Wikimedia Commons (edited)
  • Kaiser Permanente Harbor MacArthur

    Kaiser Permanente Harbor MacArthur

    Healthcare / Medical, Santa Ana, CARyan’s role: Project ExecutivePhoto: Area photo, Santa Ana: Ken Lund, CC BY-SA 2.0, via Wikimedia Commons (edited)
  • USC Village

    USC Village

    Higher Education / Mixed-Use, Los Angeles, CARyan’s role: Project Executive$700M; 1.25 million SF; housing for 2,500 students; opened 2017Photo: Nabih Youssef, CC BY-SA 4.0, via Wikimedia Commons (edited)
  • LAX — Pump Rooms

    LAX — Pump Rooms

    Aviation / Infrastructure, Los Angeles, CARyan’s role: Project ExecutivePhoto: Steven Lek, CC BY-SA 4.0, via Wikimedia Commons (edited)
  • Weber Metals — Forge Press Facility

    Weber Metals — Forge Press Facility

    Industrial / Manufacturing, Paramount, CARyan’s role: Project Executive115,000 SF; 60,000-ton forging press; press debuted 2018Photo: Representative forging-press photo: Supersonic0714, CC BY-SA 3.0, via Wikimedia Commons (edited)
  • Anheuser-Busch Production Facility

    Anheuser-Busch Production Facility

    Industrial / Manufacturing, Riverside County, CARyan’s role: Project ExecutivePhoto: Area photo, Riverside County: Fernandoh41025, CC BY-SA 4.0, via Wikimedia Commons (edited)